Big Four Bridge Ramp
Length 0.3 Km
Iroquois Park
Length 5.3 Km
Seneca Park
Length 1.9 Km
Broad Run Park
Length 2.3 Km
Waterfront Park
Length 0.6 Km
Fern Creek Park
Length 0.9 Km
John Floyd Fields
Length 1.1 Km
Des Pres Park
Length 0.8 Km
Douglas Hills
Length 2.1 Km
Big Four Bridge
Length 0.8 Km
Built by the Cleveland, Cincinnati, Chicago and St. Louis Railway, a part of the New York Central, in 1895, and updated in 1929. Use as a railroad bridge ceased by 1969 when the approaches were removed. Opened for use as a trail in 2014.
Humana Grand Allee - Beckley Creek Park
Length 3.5 Km
Scotts Gap Loop
Length 5.4 Km
Kensington Court
Length 0.2 Km
Red Short Cut Trail
Length 0.6 Km
Butchertown Greenway
Length 0.6 Km
Yost Ridge Trail
Length 3.5 Km
Wild Hyacinth Trail
Length 2.2 Km
Paul Yost Trail Access South
Length 0.5 Km
Mitchell Hill / Horine Trail Access
Length 0.4 Km
Greensward Trail
Length 1.0 Km