© Mapbox
© OpenStreetMap
Improve this map
© Mapbox
© OpenStreetMap
Improve this map
Routes
Fukushima
Date
Date pedestrian bridge (formerly Date Bridge)
Date, Fukushima
Date pedestrian bridge (formerly Date Bridge)
1
reviews
Length
0.2 mi
Est. Steps
412
Introduction
Date pedestrian bridge (formerly Date Bridge) is a 0.2 mile (412-step) route located near Date, Fukushima. This route has an elevation gain of about 0 ft and is rated as easy. Find the best walking trails near you in Pacer App.
Open in App for Details
Recommended Routes
Fukushima Shi, Japan
Jo Mopia Miyahata
Length 0.2 mi
Fukushima
Abukuma River Cycling Road
Length 0.8 mi
· Elev 26.2 ft
Fukushima Shi, Japan
Fukushima Kitachuo Park
Length 1.3 mi
Fukushima
Nanamagazaka
Length 0.2 mi
Fukushima
Nanamagarizaka
Length 2.4 mi
· Elev 724.9 ft
Fukushima Shi, Japan
Mt. Nobuo
Length 0.9 mi
· Elev 216.5 ft
Map
© Mapbox © OpenStreetMap
View Full Map
View Full Map
Route Details
Length
0.2 mi
Est. Steps
412
Recommended Routes
Fukushima Shi, Japan
Jo Mopia Miyahata
Length 0.2 mi
Fukushima
Abukuma River Cycling Road
Length 0.8 mi
· Elev 26.2 ft
Fukushima Shi, Japan
Fukushima Kitachuo Park
Length 1.3 mi
Fukushima
Nanamagazaka
Length 0.2 mi
Fukushima
Nanamagarizaka
Length 2.4 mi
· Elev 724.9 ft
Fukushima Shi, Japan
Mt. Nobuo
Length 0.9 mi
· Elev 216.5 ft
Pacer
Find the best places to walk
4.8
(55,205)
Open in App
Open
Open in App for Details
Cancel
Yes